July 1st--- plaster's finished...

And Color Stained!...

From the front... ready for rock columns...

Older shot of Carlos plastering the arched dome in the entry...

The Rock columns start with battered string lines...

And  are meticulously filled in to arrow straight walls by a team of professionals
from Ejido Michoacan!

These rocks are hand-chipped like arrow-heads until they fit with smooth faces.

Meanwhile, the columns have been finished in the Dining  Room,
matching those outside; the old beams are exposed in the ceiling,
and the floors are finished [more photos later]...

The living room is paved with two hundred year old brick...

The banister is being finished with final color coats in background...

Napa Cast Stone crown mouldings in the living room...

All finished off with an English Aga Stove in the kitchen!